This 166,650 SF new High School consists of two, three-story academic wings; one wing focused on humanities studies while the other wing is focused on STEAM programming including a fabrication or a maker’s space. The academic wings will connect to a rotunda area that serves as the knuckle of the building and includes two central drop-off points to tighten security. Connecting to the rotunda space is a health and wellness wing that includes a gymnasium, fitness area and weight rooms. In the performing arts wing, housing an auditorium, black box theater, television production studio, the band and choral programs. These two wings will include separate entrances to serve community and after-school functions. The main phases are building the new school while the existing school remains in operation and then after occupancy, abate and demolish the existing high school to complete the remaining sitework and hardscape.
Leave a Reply